Alqanoni

Regulatory Framework for Renewable Energy Generation

Para. 11.4.2
Status unknownSaudi ArabiaRegulation

Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)

For grid-connected REG Systems, the Service Provider shall define in its REG System Connection Process the documentation which shall be presented by the Eligible Consumer to give evidence of the use of the storage for an increase of the self-consumption and a reduction of the load-generation imbalances. Public Regulatory Framework for Renewable Energy Generation for Self-Consumption ANNEX 1 REG Connection Agreement Form Public Regulatory Framework for Renewable Energy Generation for Self-Consumption Preamble: 1. The phrases and expressions defined in this regulatory framework shall have the same meaning for the purpose of implementation of this Agreement, unless the context otherwise requires. 2. This Agreement states the terms and provisions agreed upon between the Service Provider and the applicant. The Agreement includes the application submitted by the applicant and all the basic data required from the applicant. 3. This Agreement refers to different regulatory documents such as the Grid Code, the Distribution Code, and this regulatory framework for REG for self-consumption and the Consumers’ Complaints Handling Procedures, which may be accessed via the Service Provider’s website or by visiting one of the branches of the Service Provider or SERA’s website. First: The preamble is considered an integral part of this Agreement. The Eligible Consumer may install the REG Systems and conduct operational tests upon signing the Application Form and this Agreement. Second: REG Systems Construction, Connection and Operation Procedures: The Eligible Consumer may construct, connect and operate the REG System according this regulatory framework upon completion of Inspecting the REG Systems by the Service Provider and checking the compliance of the REG System with the requirements of the Distribution Code or Grid Code and any other applicable codes and standards. Third: Safety and Regular Maintenance Procedures The Eligible Consumer shall abide by the operation and maintenance procedures and regular maintenance requirements of the REG Systems to ensure continues compliance with the requirements of the Distribution Code or Grid Code, and any requirements imposed by the Service Provider. For safety purposes, the Eligible Consumer shall maintain safe and easy access to the location of the Systems. Fourth: REG Systems Inspection: Without prejudice to the provisions of this Regulatory Framework for REG for self-consumption, the Service Provider may inspect the Metering Equipment and the REG Systems at the time it deems appropriate with any means it considers suitable, provided that the Service Provider notifies the Eligible Consumer at least two (2) days prior to the inspection date. The Eligible Consumer shall allow the Service Provider to conduct the inspection without hindrance. In the event that the REG System is disconnected due to violation of the terms and conditions of this Agreement, the Eligible Consumer may apply for re-inspection after making the required amendments and addressing any issues raised by the Service Provider. The Eligible Consumer shall bear the cost of re-inspection fees approved by SERA. The Eligible Consumer and the Service Provider shall agree upon the date of re-inspection within five (5) business days of the application submission for re-inspection.

The Arabic text is the legally binding version. The English translation is provided for guidance only.

Freshness not yet recorded

Related articles

Citing judgments

No judgments citing this article have been indexed yet.

Amendment timeline

No amendment history recorded.