Regulatory Framework for Renewable Energy Generation
Para. 4.11Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
The Eligible Consumer ensures that a Consultant/Contractor undertakes regular
and routine maintenance of the REG System.
4.12 In case of existence of a complaint or dispute in any matter relating to this
regulatory framework, any entity may file his complaint with the Service Provider in
accordance with the procedures for handling Consumers’ complaints approved by
SERA. If no resolution for this complaint or dispute is reached amicably or if is not
resolved by the service provider through these procedures, the Person shall have
the right to file his complaint to SERA for resolution thereof.
Public
Regulatory Framework for Renewable Energy Generation for Self-Consumption
5. ELIGIBLE CONSUMER AND REG SYSTEM CAPACITY
5.1 Any consumer wishing to install a REG System for Self-Consumption on their
Premises must satisfy the following requirements to be an Eligible Consumer:
a)
The Consumer must own or have legal right of possession of the Premises on
which the REG System is proposed to be installed. The legal right of possession
needs include a statement of eligibility to use the Premises for the purposes of
constructing and installing a REG System.
b)
The Maximum Capacity in one Premises shall not exceed 30MW.
c)
For the grid-connected Premises, the maximum connected capacity of the
renewable energy system to be installed in this Premises must not exceed its
Contracted Load.
d)
Obtain a study authorisation from SERA in accordance with the provisions of the
Electricity Law and its Implementing Regulations.
5.2 If the Consultant/Contractor is responsible for owning, maintaining and operating the
REG System under a service agreement with the Eligible Consumer to meet the load
demand, the Consultant/Contractor must obtain licenses required to engage in the
activity of electricity generation, and the generation and consumption be in the same
Premises.
Public
Regulatory Framework for Renewable Energy Generation for Self-Consumption
6. PROCEDURE FOR THE INSTALLATION OF A REG SYSTEM
6.1 Those wishing to install REG systems must apply to SERA to obtain the necessary
licenses and permits for their systems in accordance to paragraphs 4-4 and 4-5 of
this Regulatory Framework.
6.2 For grid-connected REG Systems, the Service Provider is responsible for receiving
the REG Connection Application of the Eligible Consumer and for verifying that the
REG System is designed and installed in accordance with the provisions of this
regulatory framework.
6.3 Each Service Provider shall setup a REG System Connection Process designed in
accordance with the provisions of this Regulatory Framework and the framework
guidelines stipulated in Annex 3 of this regulatory framework; the REG System
Connection Process shall clearly define the following.
a) The roles and duties of the Parties in the process.
b) All required documents, data and forms and how they shall be submitted.
c) The maximum time for the completion of the different activities defined in the
process.
d) The template of the Connection Agreement.
e) The Saudi Standards, International Standards and all applicable codes for the
design, construction, connection and operation of the REG Systems and all
studies or certificates necessary for proving compliance.
f) The analysis required to be performed by the Service Provider during the
application review stage and the applicable acceptance criteria conducted to
ensure there is no impact on the network, and it includes the studies of
planning and operation stipulated in relevant Codes.
g) A change procedure for a REG System for which the REG System
Connection Process has already been completed.
h) A change procedure for a REG System already in operation.