Regulatory Framework for Renewable Energy Generation
Para. 2.2Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
The following terms and expressions, when used in these Regulations, shall have
the meanings against each, unless the context require otherwise.
Biomass – Organic material that comes from plants and animals.
Consultant/Contractor – A person who carries out the design, examination,
installation and maintenance of REG systems for self-consumption.
Connection Point – The point of connection to the electricity system of the Network
for both consumption and export of electricity linked to a single meter installed on the
Eligible Consumer Premises.
Contracted Load – The total loads of all electrical equipment installed on the
Premises of the Eligible Consumer and it is contracted with the Service Provider.
Distribution Code – The Saudi Arabian Distribution Code issued by SERA’s Board
decision No (4/18/29) dated 02/05/1429 H and any amendments thereto.
Distribution Network – Subject to the distribution code definition, it is a system
consisting of underground cables or overhead lines, substations, and electrical
equipment with a design voltage specified in the relevant distribution license to distribute
electricity from connection points with the transmission system or with generation
stations or cogeneration stations to the connection points connected with consumers or
other distribution systems. This system includes any installations, electrical equipment,
and meters owned or operated for distributing electricity. This system does not include
any part of a transmission system.
Distribution Service Provider (DSP) – The legal entity licensed by SERA to practice
electricity distribution and/or retail sale activities.
Distribution Service Provider Business Area – The geographical area in which the
Distribution Service Provider is licensed to engage in electricity distribution and retail
sales activities.
Eligible Consumer – A consumer who aims to install, operate and own a REG
System on their Premises, and meets the requirements of this Regulatory Framework.
Grid Code – the Saudi Arabian Grid Code issued by SERA’s Board decision No
(3/16/28) dated 01/06/1428 H and any amendments thereto.
The Arabic text is the legally binding version. The English translation is provided for guidance only.