Saudi Arabian Grid Code May 2024
Para. 4.5.3Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
(Procedure for notification
of Operations, Events and Significant
Incidents)
June 2017
Electronic
Update
10 April 2017
Amendment No. 15A065 pertains to: (i)
modification of clause 4.3.5.5 to consider
Nuclear Power Plant in the Provisional
Transmission Outage Program; and (ii)
addition of new clause 4.3.5.7 concerning
Nuclear Safety.
June 2017
Electronic
Update
10 April 2017
Amendment No. 15A067 pertains to
modification of: (i) clause 5.3.6.3 concerning
Sustainable Resource Generation; and (ii)
Appendix A6.1 to add data description “Cold
Start after refueling for NPP”.
Chronology of Saudi Arabian Grid Code Revisions
The Saudi Arabian Grid Code
Updated Version: May 2024
Sr. No. Publication
No. / Date
SERA’s
Approval
Date
Detail(s) of the Revision
February
Electronic
Update
20 February
Amendment No. 17A072 pertains to the
transferring of the responsibility of
accreditation of independent meter
calibrating agencies / laboratories from the
Regulator to the Saudi Accreditation Center
as per Clauses 7.3.4 and 7.8.4.
April 2021
Electronic
Update
9 September
Amendment No. 19A074 pertains to the
authority given by the SERA Board to the
Regulator’s Governor to decide on any
request for amendment or Derogation.
April 2021
Electronic
Update
23 December
Amendment No. 18A073 pertains to the
inclusion of a new member to the Grid Code
Supervisory Committee that will represent
Principal Buyer.
April 2021
Electronic
Update
20 April 2021
Amendment No. 20A076 refers to the
addition of new requirements for PSS in
April 2021
Electronic
Update
20 April 2021
Amendment No. 20A077 pertains to the
addition of new clause 3.3.3.8 concerning
model re-validation of the generator and its
control system.
September
Electronic
Update
27 September
Amendment No. 21A079 refers to the
changing of name of the Electricity &
Cogeneration Regulatory Authority with
Water and Electricity Regulatory Authority
and likewise, the acronym ECRA to be
replaced with WERA.
February
Electronic
Update
9 February
Amendment No. 21A082 refers to the
addition of new paragraphs at the end of
Clause 4.4.3.1 concerning Fast Frequency
Response.
February
Electronic
Update
9 February
Amendment No. 21A083 refers to the
addition of two (2) new Clauses 2.5.5.16 and
2.5.5.17, containing Figures 2.3 and 2.4,
respectively, i.e., regarding the Active Power
requirements for BESS at the Connection
Point, in the event of frequency and voltage
deviations; and BESS capability to provide
specific frequency response in stabilizing
Grid System frequency.
February
Electronic
Update
9 February
Amendment No. 21A084 refers to addition of
new paragraph at the end of clause 2.5.5.23
(ii) concerning BESS capability to provide
maximum voltage support.
February
Electronic
Update
9 February
Amendment No. 21A085 refers to addition of
new subsection 2.4.9 entitled Phase Jumps.
Chronology of Saudi Arabian Grid Code Revisions
The Saudi Arabian Grid Code
Updated Version: May 2024
Sr. No. Publication
No. / Date
SERA’s
Approval
Date
Detail(s) of the Revision
February
Electronic
Update
9 February
Amendment No. 21A086 refers to addition of
new three (3) items for System Services in
Section 2.6 and new clause 4.4.7.7
concerning minimum requirements for BESS
Black Start.
February
Electronic
Update
9 February
Amendment No. 21A087 refers to addition of
nine (9) new defined terms concerning BESS
in the Glossary and Definitions.
February
Electronic
Update
9 February
Amendment No. 21A088 refers to addition of
new clauses 2.5.5.33, 2.5.5.34, and 2.5.5.35
concerning BESS SoC Limits and Reactive
Power Support.
February
Electronic
Update
9 February
Amendment No. 21A089 refers to addition of
new A3.2.3 concerning the BESS data that
shall be submitted to the TSP.
February
Electronic
Update
9 February
Amendment No. 21A090 refers to addition of
new subsection 2.4.10 and two (2) new
clauses, 2.5.5.6 and 3.3.6.3, concerning
Short Circuit Ratio.
February
Electronic
Update
9 February
Amendment No. 21A091 refers to addition of
new item (ix) in subsection 2.3.5 concerning
BESS Connection Agreement.
July 2022
Electronic
Update
24 July 2022
Amendment No. 21A080 refers to increasing
the Fault clearance time for the 132 KV from
100 milliseconds to 120 milliseconds in
Clause 2.5.2.6.
May 2024
Electronic
Update
15 May 2024
Amendment No. 24A096 refers to the
changing of name of the Water and
Electricity Regulatory Authority with Saudi
Electricity Regulatory Authority and likewise,
the acronym WERA to be replaced with
SERA.
Note: The 1st Publication of the SAGC was issued on May 2007.
The Arabic text is the legally binding version. The English translation is provided for guidance only.
Freshness not yet recorded