Alqanoni

Saudi Arabian Grid Code May 2024

Para. 6.5.4
Status unknownSaudi ArabiaRegulation

Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)

If a User fails to supply data when that User is required to provide that to the TSP, the TSP will estimate such data if and when, in the view of the TSP, it is necessary to do so. 6.5.5 If the TSP fails to supply data to a User, the User to whom that data ought to have been supplied, will estimate such data if and when, in the view of that User, it is necessary to do so. 6.5.6 Such estimates will, in each case be based upon data supplied previously for the same Plant or Apparatus or using corresponding data for similar Plant and/or Apparatus or such other information as the TSP or User, as the case may be, deems appropriate. 6.5.7 The TSP will advise a User in writing of any estimated data it intends to use relating directly to that User Plant and/or Apparatus in the event of data not supplied. 6.5.8 The User will advise the TSP in writing of any estimated data it intends to use in the event of data not supplied. 6.5.9 Any risk associated with the use of estimated data will be borne by the party that has failed to provide the required data. Chapter 6 - Data and Information Exchange Code The Saudi Arabian Grid Code Updated Version: May 2024 6.5.10 Wherever practicable, Users, while submitting data, should identify the recognized national or international standard to which their Plant, Equipment, and/or Apparatus was designed. Data and Information to be Registered 6.6.1 The following Schedules shall be supplied by Users (Generation, Distribution Entities, and Directly-connected Customers) to the TSP and will cover the required data for each User: (i) Schedule 1: Generating Unit Technical Data. This shall comprise Generating Unit/Station fixed parameters. (ii) Schedule 2: Generating Unit/Station Outage Data. This shall comprise Generating Unit/Station Equipment Outage Planning Data. (iii) Schedule 3: Generation Operation Schedule Data. This shall comprise data required for the preparation of the Generation Schedule. (iv) Schedule 4: Generation Operational Planning Data. This shall comprise Generating Unit/Station parameters required for Operational Planning. (v) Schedule 5: User System Data. This shall comprise electrical parameters relating to Plant and Apparatus connected to the Transmission System. (vi) Schedule 6: Connection Point Data. This shall comprise data related to Demand and Demand transfer capability. (vii) Schedule 7: Demand Control Data. This shall comprise data relating to Demand Control. (viii) Schedule 8: Scheduling and Dispatch Data. This shall comprise parameters required for Scheduling and Dispatch of Generating Unit/Station. (ix) Schedule 9: Load Characteristics Data. This shall comprise estimated parameters of loads in respect of Harmonic content, sensitivity, etc. Chapter 6 - Data and Information Exchange Code The Saudi Arabian Grid Code Updated Version: May 2024 (x) Schedule 10: Fault Infeed Data. This shall comprise data related to short circuit infeed of User Equipment to the Transmission System. (xi) Schedule 11: User Demand Profiles and Active Energy Data. This shall comprise data related to Demand profiles. 6.6.2 The following Schedule shall be made available by the TSP to Users: (i) Schedule 12: Data Supplied by the TSP to all Users. This shall comprise data supplied by the TSP to Users.

The Arabic text is the legally binding version. The English translation is provided for guidance only.

Freshness not yet recorded

Related articles

Citing judgments

No judgments citing this article have been indexed yet.

Amendment timeline

No amendment history recorded.