Port Services Fees and Charges 3rd edition
Para. 3.4Status unknownSaudi ArabiaRegulation
Issued by Saudi Ports Authority — Mawani (mawani.gov.sa)
The charges for empty split-trailers shall be 15 Rate in riyals per 20 linear
feet for each day or part thereof upon the lapse of 10 days from the date of
unloading.
4. Charges for Maritime Services:
The following ships shall be excluded from such charges:
Military ships.
Fuel supply ships, water supply ships, excursion ships, fishing ships, tug
boats, service launches, and barges. Half the charges stipulated in (4.2) shall
be collected if such vessels occupy space on a commercial wharf.
4.1 The charges of pilotage, rope tying and untying, and maritime control tower
services, including the use of tug boats, rope tying launches, and pilotage
launches, shall be charged for each ship in the following cases:
- Arrival at the port.
- Departure from the port.
- Half the charges shall be collected for transferring from one wharf to another.
This shall be based on the ship's capacity in total tones as follows:
Item
No.
Description
Rate in riyals
500 tons or less
More than 500 up to 3000 tons
1/ton
Each increase from 3000 up to 15000 tons
15 halala/ton
Each increase over 15000 tons
10 halala/ton
4.2 Collecting charges for the ship’s use of the anchorage area according to the
ship’s capacity in gross tones shall be as follows:
Item
No.
Description
Rate in riyals
Unit
500 tons or less
per day or part
thereof
More than 500 up to 3000 tons 1000
per day or part
thereof
More than 3000 up to 15000
tons
per day or part
thereof
More than 15000 tons
per day or part
thereof
The Arabic text is the legally binding version. The English translation is provided for guidance only.
Freshness not yet recorded