Port Services Fees and Charges 3rd edition
Para. 4.3Status unknownSaudi ArabiaRegulation
Issued by Saudi Ports Authority — Mawani (mawani.gov.sa)
Collecting charges for the ship's use of wharf according to the ship's
capacity in total tons shall be as follows:
Item
No.
Description
Rate in riyals
Unit
3000 tons or less
per day or part
thereof
More than 3000 tons
per day or part
thereof
Note:
1. The ship's capacity in total tones is the gross registered tonnage (GRT) or
gross tonnage (GT). If the ship uses both, the charges shall be calculated
according to the highest figure.
2. The duration of a ship's usage of the wharf shall commence from the time of
its arrival at the wharf and ends with its departure therefrom. Every 24 hours
or part thereof the ship spends at the wharf shall be deemed one day.
3. The duration of a ship's usage of the anchorage area shall commence from
the time it enters the area and ends with its departure therefrom. Every 24
hours or part thereof the ship spends at the anchorage area shall be deemed
one day.
4. The charges stipulated in (4.1) shall be collected whether the ship receives all
the services or part thereof; ships the service of which does not require the
use of tug boats shall be charged half of the charges.
5. Ships the service of which requires special treatment due to its inability to use
the engines or a defect in the rudder or the like shall be charged double the
charges stipulated in (4.1).
6. The fee stipulated in (4.3) shall not be collected if the ship remains in the
anchorage area due to lack of space in the wharf.
7. The fee stipulated in (4.1) shall be collected if the ship moves from one wharf
to another upon the request of the ship or the agent.
8. The charges stipulated in (4.2) shall not be collected for the following periods:
A ship's period of stay at a wharf for non-handling operations upon a written
request from a government agency.
A period of complete stoppage of handling operations for more than 24 hours
for reasons beyond the control of the ship or the shipping agent.
5. Charges for Passenger Services:
Item
No.
Description
Rate
in
riyals
Unit
Arriving or departing passengers
per passenger
Table (B) Second: Charges Collected from the Owner of Cargo
Table (B)
Second: Charges Collected from the Owner of Cargo
1. Port Service Charges for Imported or Exported Cargo:
Item No.
Description
Rate
in
riyals
Unit
General cargo
per ton or part
thereof
Vehicles and equipment
per ton or part
thereof
Bagged cargo and foodstuffs
per ton or part
thereof
Bagged cement (exported)
per ton or part
thereof
Note:
- General cargo shall include all cargo, except vehicles, self-propelled
equipment, livestock, bulk cargo, or cargo loaded onto containers, flatbed
trucks, or trailers.
- In case of dangerous cargo, an additional 25% shall be collected.
1.5 Livestock:
Item No.
Description
Rate
in
riyals
Unit
Sheep
per head
Other Livestock
per head
Note:
The charges for port services indicated in (1.1 - 1.5) above shall be collected
for unloading cargo from ships and transporting them to transitional areas or
storage yards and stacking them in packs or sorting them in hangars after
sorting. They shall then be transferred to customs inspection halls and then to
the owners' means of transport. In case of export, the same process shall be
followed in reverse, whether all the services or part thereof is provided.
Item No.
Description
Rate
in
riyals
Unit
Bulk
cargo,
including
foodstuffs and bulk cargo
per ton or part
thereof
handled at sites of cement,
grains, oils, and the like,
excluding
oil,
liquid
oil
derivatives, and gas
Bulk cement and clinker
(exported)
per ton or part
thereof
Note:
The charges for the port services indicated in (1.6) and (1.7) above shall be
collected for using the port's basic equipment.
The Arabic text is the legally binding version. The English translation is provided for guidance only.
Freshness not yet recorded