Saudi Arabian Grid Code May 2024
Para. 1.10.5Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
The TSP shall provide administrative and logistic support to the GCSC for the
GCSC’s functioning by establishing the Grid Code Secretariat. This decision
may be reviewed by the Regulator. The Secretariat shall be accountable to
Chapter 1 - General Conditions
The Saudi Arabian Grid Code
Updated Version: May 2024
the Regulator as well as to the GCSC for its activities. The detailed functions
and responsibilities, administrative structure, and modes of operation of the
Secretariat will be further elaborated by the GCSC in its rules and procedure
as laid down in (1.10.4) above.
Grid Code Amendment or Derogation Process
1.11.1 The Regulator is the approving authority for the Grid Code, as well as for
making amendments to it and for granting any Derogation from its provisions.
The Regulator’s Governor has the authority to approve any request for
amendment or Derogation. For approving any request for amendment or
Derogation, the Regulator will be guided by the GCSC recommendations on
the relevant matter.
1.11.2 Any Participant, GCSC member, or the Regulator itself may propose
amendments to the Grid Code.
1.11.3 Any Participant can seek Derogation from complying with one or more
provisions of the Grid Code. The Derogation may be granted by the Regulator
on the following grounds:
(i)
to provide for existing Plant and/or Apparatus that has not been
designed in accordance with the provisions of the Grid Code;
(ii)
to facilitate a smooth transition to the Grid Code from the existing
situation; and/or
(iii)
to ease temporary constraints that prevent compliance and
necessitate exemption.
1.11.4 A Participant seeking Derogation shall make a written request to the GCSC
and shall be required to justify the request in terms of both the specific
circumstances and the expected duration. As a minimum, the application
must include the following information:
(i)
detail of the applicant;
(ii)
relevant provision(s) of the Grid Code and the required performance;
(iii)
a description of the relevant Plant and/or Apparatus and the nature
and extent of non-compliance;
(iv)
a description of the proposal for restoring compliance (where
applicable) including details of actions to mitigate risks and restore
compliance including timetable;
(v)
a description of the reasonable alternative actions that have been
considered; and
Chapter 1 - General Conditions
The Saudi Arabian Grid Code
Updated Version: May 2024
(vi)
a statement of the expected duration of the non-compliance.
1.11.5 The process for seeking amendments to the Grid Code or seeking Derogation
from its provisions is depicted in Figure 1.1.
Figure 1.1. Grid Code Amendment/Derogation Process
1.11.6 On receipt of any request for Grid Code amendment or Derogation, the
GCSC shall promptly consider such request (by seeking expert
advice/opinion on the request, if necessary) and submit its
recommendation(s) to the Regulator for a final decision.
1.11.7 The Regulator shall consider the request in light of the recommendation(s) of
the GCSC, and shall decide as appropriate. In deciding on the request, the
Regulator may invite the relevant Participant or any member of the GCSC to
seek clarification on the request.
1.11.8 The Regulator shall communicate its final decision to GCSC for informing the
relevant Participant and/or for taking further action, as appropriate.
The Arabic text is the legally binding version. The English translation is provided for guidance only.
Freshness not yet recorded