Site Operational Procedures The TSP and the Users must make available staff to take necessary Safety Precautions and carry out operational duties as may be required to enable work/Testing to be carried out and for the operation of Plant and/or Apparatus connected to the System. Chapter 2 - Connection Code The Saudi Arabian Grid Code Updated Version: May 2024 User submits to TSP completed application form along with applicable fees. Figure 2.6. Procedure for Connection to the Grid Energization Connection Agreement between User and TSP is signed. Preparation of project documents by User. Completion of User Development work. User submits Readiness to Connect statement with Commissioning Tests Reports. TSP issues Technical Completion Certificate. TSP evaluates User application. TSP conducts Grid Impact Studies. Application returned with suggestions for revision, if practicable. TSP and User meet to resolve dispute. User revises the application. Yes No Additional study Application acceptable? User accepts? Dispute resolved Yes Yes No No Yes TSP makes Offer of Connection to User. No No User accepts to pay? Additional Study Required? Yes TSP and User meet Dispute resolved? Yes No Yes User application rejected Case closed Yes No User may approach GCSC No Offer accepted? User accepts? Chapter 2 - Connection Code The Saudi Arabian Grid Code Updated Version: May 2024 APPENDIX A2.1: Preparation of Site Responsibility Schedules A2.1.1 Principles A2.1.1.1 At all Sites, the following Site Responsibility Schedule shall be drawn up using the Pro forma Table A2.1 or with such variations as may be agreed between the TSP and Users. In the absence of agreement, the Pro forma Table A2.1 shall be used: (i) Schedule of (E)HV Apparatus; (ii) Schedule of LV Plant, Apparatus, services and supplies; (iii) Schedule of telecommunications and measurement Apparatus. A2.1.1.2 Each Site Responsibility Schedule for a Connection Site shall be prepared by the TSP in consultation with other Users at least one (1) month prior to the Completion Date under the Connection Agreement for that Connection Site (which may form part of a Site). A2.1.1.3 Each User shall, in accordance with the timing requirements of the Connection Agreement, provide information to the TSP to enable it to prepare the Site Responsibility Schedule. A2.1.1.4 Each Site Responsibility Schedule shall be subdivided to take account of any separate Connection Sites on that Site. A2.1.1.5 Each Site Responsibility Schedule shall detail for each item of Plant and/or Apparatus: (i) Plant/Apparatus ownership; (ii) Responsible Manager (Controller); (iii) Safety standards (applicable Safety Rules and standards); (iv) Responsible person(s) responsible for coordinating on Safety matters; (v) operations (applicable operational procedures and Control Engineer); and (vi) responsibility to undertake maintenance. A2.1.1.6 The (E)HV Apparatus Site Responsibility Schedule for each Connection Site must include lines and cables emanating from the Connection Site. A2.1.1.7 Every page of the Site Responsibility Schedule shall bear the date of issue and the issue number. A2.1.1.8 When a Site Responsibility Schedule is prepared, it shall be sent by the TSP to the Users involved for confirmation of its accuracy.

The Arabic text is the legally binding version. The English translation is provided for guidance only.

Freshness not yet recorded

Related articles

Citing judgments

No judgments citing this article have been indexed yet.

Amendment timeline

No amendment history recorded.