Saudi Arabian Grid Code May 2024
Para. 2.7.4Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Connection Point Drawings
2.7.4.1 Connection Point Drawings shall be prepared for each Connection Site and
shall include Site layout drawings, mechanical drawings, electrical layout
drawings, electrical Single Line Diagrams, common Protection/control
drawings, and common services drawings.
2.7.4.2 The TSP shall specify the procedure and format to be followed in the
preparation of the Connection Point Drawings for any Connection Point.
2.7.4.3 The User shall prepare and submit to the TSP, drawings for all the
Equipment, circuits, and facilities on the User’s side of the Connection Point,
in accordance with the schedule specified in the Connection Agreement.
2.7.4.4 The TSP shall provide the User with drawings for all the Equipment, circuits,
and facilities on the TSP side of the Connection Point, in accordance with the
schedule specified in the Connection Agreement.
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
2.7.4.5 If the Connection Point is at the User’s Site, the User shall prepare and
distribute Connection Point Drawings for the entire Connection Point.
Otherwise, the TSP shall prepare and distribute the Connection Point
Drawings for the entire Connection Point.
2.7.4.6 The Connection Point Drawings shall provide an accurate record of the layout
and circuit connections, ratings and identification of Equipment, and related
Apparatus and devices at the Connection Point.
2.7.4.7 If possible, all the electrical Equipment at the Connection Point shall be
shown in one Connection Point Drawing. When more than one Drawing is
necessary, duplication of identical information shall be minimized. The
Connection Point Drawing(s) shall represent, as closely as possible, the
physical arrangement of the Equipment and their electrical connections.
2.7.4.8 The Connection Point Drawing shall be prepared using the Site and
Equipment identification and labeling prescribed in (2.7.3).
2.7.4.9 The title block of the Connection Point Drawings shall include the names of
authorized persons together with provisions for the details of revisions, dates,
and signatures.
2.7.4.10 The Connection Point Drawings shall have the TSP stamp. The master copy
of the Connection Point Drawings shall remain with the TSP.
2.7.4.11 If a dispute arises, a meeting shall be held between the TSP and the User to
resolve the dispute at the shortest possible time.
Preparation of Connection Point Drawings for a Connection Point at a
User Site
(i)
In the case of a Connection Point at a User Site, the TSP shall
prepare and submit to the User, Connection Point Drawings for the
TSP side of the Connection Point in accordance with the requirements
of the Connection Agreement.
(ii)
The User shall then prepare, produce, and distribute, using the
information provided by the TSP, Connection Point Drawings for the
complete Connection Site in accordance with the requirements of the
Connection Agreement for approval by the TSP.
The Arabic text is the legally binding version. The English translation is provided for guidance only.