Saudi Arabian Grid Code May 2024
Para. 4.4.5Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
System Control
4.4.5.1 In implementing the Transmission Outage Program, in normal operation of
the Transmission System, and in responding to Emergency and Fault
situations on the Transmission System, the TSP may need to carry out
network switching and Control Actions which may, from time to time, affect
the operations of Users or Security of supply to Users.
4.4.5.2 Operational network switching may be required by the TSP for a number of
purposes including the following:
(i)
Outages of Transmission Plant and/or Apparatus for the purposes of
maintenance, new works, Operational Tests, Protection Testing, and
work by Users;
(ii)
Outages of Transmission Plant and/or due to suspected or potential
Faults and Emergency repairs;
(iii)
Voltage Control; or
(iv)
limiting Power flows on the Transmission System to levels consistent
with the capabilities of the Transmission Plant and System Security.
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
4.4.5.3 System switching may also occur automatically and without advance warning
due to operation of Protection schemes in isolating or clearing of Faults on
Transmission Plant or on User Plant which is connected to the Transmission
System.
4.4.5.4 Automatic switching sequences may also be established to limit Power flows
or voltage or frequency deviations in the event of Faults elsewhere on the
Transmission System.
4.4.5.5 Notification to Users of Control Actions
(i)
The TSP will only inform the User of a Control Action on the
Transmission System if the Control Action has (or expected to have) a
Material Effect for the User.
(ii)
Where the TSP is unable to inform the Users prior to the Control
Actions, then the provisions of (4.4.5.6) shall apply.
(iii)
Where it is identified and agreed, in accordance with the terms of the
Connection Agreements and/or operating agreements, between the
TSP and a User that a specific Control Action (usually an action
affecting the Transmission System configuration) has an Operational
Effect on a User and that there is merit in notifying the User in
advance of the Control Action, then the TSP will notify the User of the
Control Action (if planned and where time permits), in accordance with
any standing agreement with the User.
(iv)
Typical examples of actions notified in accordance with (iii) above may
include:
(a)
notification to Users of a significant reduction in supply
Security to a Connection Point, where the User may arrange
standby feeding arrangements at lower voltages; and/or
(b)
notification to a Directly-connected Customer of a significant
reduction in supply Security to a Connection Point (such as the
Outage of one of two Connections) where the Directly-
connected Customer may arrange standby supply or run in-
house Generation.
4.4.5.6 Control under Fault or Emergency Conditions
(i)
In the event of a System Fault or Protection operation or other
automatic operation, it will not be possible to invoke standing
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
procedures in accordance with (4.4.5.5) prior to the occurrence of the
Control Action.
(ii)
In the circumstances referred to above or in the event that the TSP
needs to implement Control Actions urgently and without informing
Users, then unless the situation is of a temporary nature and has been
rectified to normal, the TSP shall inform Users of the occurrence of the
actions.
(iii)
The TSP shall also inform the Users as to the likely duration of the
condition and shall update this prognosis as appropriate. The TSP
shall additionally inform the Users when the condition no longer
prevails.
4.4.5.7 De-energization of Users by the TSP
(i)
The TSP may have to De-energize a User's Plant and Apparatus from
time to time if, and to the extent, that the TSP reasonably considers it
necessary in order to provide for safe and secure operation of the
Transmission System in circumstances which otherwise cause or
likely to cause one or more of the following:
(a)
risk to the Safety of personnel;
(b)
risk to the Stability of the Transmission System;
(c)
risk to the Transmission System or any User's Plant and/or
Apparatus;
(d)
Transmission System elements to become loaded beyond their
emergency limits;
(e)
voltage excursions on the Transmission System outside the
ranges specified in (2.4.3) of Chapter 2: Connection Code;
(f)
any behavior causing sustained operation outside the normal
Transmission System operating frequency range;
(g)
any material breach of a Connection Condition; or
(h)
any action or inaction which places the TSP in breach of any
statutory or regulatory obligation.
(ii)
The TSP will notify the relevant User ahead of time about the De-
energization, wherever it is practicable for the TSP, to allow the User
an opportunity and reasonable time to remedy/rectify the problem. In
extreme situations, however, when there is an imminent threat to the
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
Stability and Security of the System, the TSP will not be obliged to
notify the User ahead of the De-energization.
The Arabic text is the legally binding version. The English translation is provided for guidance only.