Voltage Control
4.4.4.1 To maintain Transmission System Security and integrity, to avoid damage to
the Transmission System and to User Plant, and to maintain voltages at User
Connection Points within the limits specified in Chapter 2: Connection Code,
the TSP shall exercise control of the Transmission System voltages.
4.4.4.2 The TSP shall strive to maintain sufficient availability of dynamic and static
Reactive Power capability in order to maintain Transmission System voltages
at Connection Points within the levels specified in (2.4.3) of Chapter 2:
Connection Code, at all times by means of one or more of the following
measures:
(i)
the charging capacitance of the Transmission System;
(ii)
User Mvar Demand;
(iii)
Transmission System Mvar losses;
(iv)
Generating Unit Mvar production or absorption;
(v)
through on-load tap changing of Generating Unit step-up transformer;
(vi)
Voltage Control facilities, such as capacitor banks and reactors; and
(vii)
dynamic voltage support.
4.4.4.3 Voltage Control Policy
The TSP shall control System voltage to minimize system losses and cost of
System Services. The TSP shall determine and modify, as appropriate,
general procedures for use in controlling voltage on the Transmission
System. These procedures shall be formulated with due regard to minimizing
cost of the Transmission System operation and optimizing System Safety and
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
Reliability. In particular, the Voltage Control shall take cognizance of the daily,
weekly and seasonal factors, and the TSP shall determine:
(i)
suitable target voltages in order to limit/control the effect of
Transmission capacitance;
(ii)
best utilization of dedicated Voltage Control facilities; and
(iii)
Mvar dynamic reserve requirements.
4.4.4.4 Voltage Control Methods
(i)
The TSP shall continuously monitor the Transmission System
voltages. Appropriate voltage monitoring points shall be determined by
the TSP, taking account of the Voltage Control policy and in particular
of the Transmission System conditions pertaining at the time of
operation.
(ii)
The TSP shall adjust Transmission System voltages, using control
facilities that are available so as to achieve the Mvar Capacity
necessary in order to operate the Transmission System voltages at
Connection Points within the levels specified in (2.4.3) and retain a
dynamic Mvar capability to deal with changing System conditions
which result from changes in Demand or changes in Transmission or
Generation configuration, whether as a result of Control Actions or
Faults.
(iii)
The Excitation System of each Synchronous Generating Unit shall be
operated under the control of a continuously acting Automatic Voltage
Regulator (AVR), which shall be set so as to maintain a constant
terminal voltage. The Generator may not disable or restrict the
operation of the AVR except in accordance with (iv) below, in which
event the Generator shall notify the TSP immediately.
The Automatic Voltage and Reactive Power Regulator System of each
Power Park Module shall be operated under the control mode and
with the set point agreed with the TSP (according to Ch. 2). The
Generator may not disable or restrict the operation of the Automatic
Voltage and Reactive Power Regulator Systems except in accordance
with (iv) below, in which event the Generator shall notify the TSP
immediately.
(iv)
The Generator may only disable or restrict the AVR action where: