Objectives
The objectives of this section are:
(i)
to establish a policy to ensure Frequency Control capability in the
Transmission System for operational control by the TSP, and to set
out appropriate procedures to enable the TSP to control the
Transmission System frequency and (insofar as possible) maintain it
within the limits specified in Chapter 2: Connection Code;
(ii)
to set out control strategies to be used by the TSP, in conjunction with
Users where appropriate, for controlling the Transmission System
voltages;
(iii)
to describe the various time scales for which Operating Margins are
required, the policy which will govern the Dispatch of the reserves,
and the procedures for monitoring the performance of Generating
Units and other reserve providers; and
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
(iv)
to set out requirements relating to Black Start Stations to enable the
TSP to recover the Transmission System from a Partial or Total
Shutdown.
4.4.3 Frequency Control
4.4.3.1 The TSP will achieve Frequency Control through Primary Frequency Control
and Secondary Frequency Control, as set out below:
(i)
Primary Frequency Control takes place in the period of up to thirty (30)
seconds after a change in frequency and is achieved by automatic
corrective measures to frequency deviations occurring on the
Transmission System. Automatic Primary Frequency Control Actions
in response to normal frequency fluctuations, within the levels
specified in (2.4.2) on the Transmission System are also commonly
termed as "Frequency Regulation".
(ii)
frequency deviations, outside the levels specified in (2.4.2) such as
those that may occur on the loss of one or more Generating Unit(s), or
other MW input into the Transmission System or the Distribution
System are corrected through the use of Operating Reserve.
(iii)
Secondary Frequency Control takes place in the time scale from 30
seconds up to 10 minutes after the change in frequency. It is provided
by a combination of automatic and manual actions.
BESS Facilities connected to the Transmission System must be capable of
Fast Frequency Response. Additional Active Power must be injected to the
System in response to changes in measured frequency to improve the
Frequency Nadir or initial Rate of Change of Frequency. The additional Power
and the response time will be stated in the relevant System Services
Agreement.
The accuracy of the completed Fast Frequency Response must not deviate
by more than 1% over a period of 1 minute.
4.4.3.2 Generation Speed Governor Systems of Synchronous Generating Units
(i)
To maintain Frequency Regulation capability in the Transmission
System, Generators are required to comply with the provisions of this
section at all times other than as permitted in exceptional
circumstances as laid down in (v) below.
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
(ii)
Generating Units when Synchronized with the Transmission System
shall operate at all times under the control of a Speed Governor
System, unless otherwise specified by the TSP, with characteristics
within the appropriate ranges as specified in Chapter 2: Connection
Code;
(iii)
No time delays other than those necessarily inherent in the design of
the Speed Governor System shall be introduced;
(iv)
Governor Systems shall, as a minimum, be fully responsive to
frequency deviations exceeding ±
The Arabic text is the legally binding version. The English translation is provided for guidance only.