Saudi Arabian Grid Code May 2024
Para. 4.3.6Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Data Requirements
4.3.6.1 When requested initially under a Power Purchase Agreement and thereafter
by end of December each calendar year, each Generator shall in respect of
each of its Generating Units submit to the TSP in writing the Generator
Performance Chart and the Generation Planning Parameters to be applied
from the beginning of next year onwards, using the schedules provided in
Chapter 6: Data and Information Exchange Code. The Generation Planning
Parameters shall be used by the TSP for Operational Planning purposes only
and not in Scheduling and Dispatch.
4.3.6.2 In the case of a Generating Unit which is capable of firing on two different
fuels, the Generator must submit to the TSP, by separate written notifications,
the Generation Planning Parameters in respect of each fuel, clearly marked to
indicate for which fuel it applies, and also the primary and the standby fuel.
4.3.6.3 The Generator Performance Chart must be on a Generating Unit specific
basis at the Generating Unit terminals and must include details of the
Generator step-up transformer parameters and demonstrate the limitation on
Reactive Power capability of the Transmission System voltage at three (3)%
above nominal.
4.3.6.4 For each non-Renewable Resource Generating Unit whose performance
varies significantly with ambient temperature, the Generator Performance
Chart shall show curves for at least two values of ambient temperature so that
the TSP can assess the variation in performance over all likely ambient
temperatures by a process of linear interpolation or extrapolation. One of
these curves shall be for the ambient temperature at which the Generating
Unit output equals its Registered Capacity.
4.3.6.5 For each Renewable Resource Generation whose performance varies
significantly as a function of non-controllable external/ environmental
parameters, such as (but not limited to) temperature, quantity of dust in the
air, wind, solar irradiance, the Generator Performance Chart shall show
curves for at least two values for each significant parameter, so that the TSP
can assess the variation in performance over all likely values of these
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
parameters by a process of linear interpolation or extrapolation. One of these
curves shall be for the reference value at which the Generating Unit output
equals its Registered Capacity.
System Services
4.4.1 Introduction
4.4.1.1 This section deals with System Services which are essential to the proper
functioning of the Transmission System, and which also determine the Quality
of supply. This section specifically deals with the following System Services:
(i)
Frequency Control;
(ii)
Voltage Control;
(iii)
System Control;
(iv)
Operating Margin; and
(v)
Black Start.
4.4.1.2 The TSP shall have control over all System Services, that is, it shall
determine what System Services are to be provided, when, and by whom.
In the case of RRG, the TSP shall coordinate with and instruct the SSECC in
relation to System Services. The SSECC shall then implement the TSP’s
instructions, to the extent possible, in a timely manner.
The Arabic text is the legally binding version. The English translation is provided for guidance only.