Operating Margin
4.4.6.1 In order to deal with Demand Forecast uncertainties and to safeguard against
a sudden loss of Generation from the Transmission System, it is imperative
that a suitable Operating Margin be maintained through the Control Phase.
Operating Margin is required to have Capacity available in the System that
can be utilized for reliable and secure balancing of supply and Demand.
4.4.6.2 Operating Margin is the additional output from Generating Plants or Demand
Control which is realizable in real time to aid in containing and correcting any
System frequency falling to an acceptable level due to loss of Generation or a
mismatch between supply and Demand.
4.4.6.3 The Operating Margin consists of Operating Reserve (further divided into 3
categories, Primary, Secondary, and Tertiary Operating Reserve) and
Contingency Reserve as further elaborated in the following paragraphs.
4.4.6.4 Operating Reserve
Operating Reserve’s definitions relate to the time elapsed from the
occurrence of an Event which has initiated a frequency disturbance. The
definition of the time at which the Event is deemed to have occurred and
other associated definitions are addressed in the terms and condition laid
down under Operating Margin Policy.
(i)
Primary Operating Reserve
(a) Generating Units providing Primary Operating Reserve for
Frequency Regulation as a System Service shall operate in an
automatic Frequency Sensitive Mode (also known as free-
governor mode in the case of Synchronous Generating Units) for
automatic response of the Unit’s Power output to changes in
frequency.
The Speed Governor Systems of the Synchronous Generating
Unit shall have a maximum response time of five (5) seconds.
The Active Power response of Power Park Modules to frequency
deviations (Frequency Regulation) shall respond as fast as
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
technically feasible with an initial delay that shall be as short as
possible and no greater than two (2) seconds.
The automatic change in Active Power output of a Generating Unit
shall also increase or decrease in response to a System frequency
decrease or increase.
(b) The Positive Primary Response is the automatic increase in Active
Power output of a Generating Unit in response to a System
frequency fall in accordance with the Primary Control capability
and additional mechanisms for releasing Active Power. The
Negative Primary Response is the automatic decrease in Active
Power output of a Generating Unit in response to a System
frequency rise in accordance with the Primary Control capability
and additional mechanisms for reducing Active Power output.
(ii)
Secondary Operating Reserve
Secondary Operating Reserve is the additional MW output (and/or
reduction in Demand) required compared to the pre-Incident output (or
Demand), which is fully available and sustainable over the period from
15 to 90 seconds following an Event.
(iii)
Tertiary Operating Reserve
Tertiary Reserve is further divided into Band 1 and Band 2, as
explained below:
(a)
Band 1: additional MW output (and/or reduction in Demand)
required compared to the pre-incident output (or Demand)
which is fully available and sustainable over the period from
ninety (90) seconds to five (5) minutes following an Event.
(b)
Band 2: additional MW output (and/or reduction in Demand)
required compared to the pre-Incident output (or Demand)
which is fully available and sustainable over the period from
five (5) minutes to thirty (30) minutes following an Event.
4.4.6.5 Contingency Reserve
Contingency Reserve is the margin of available Generation Capacity over
Forecast Demand, which is required in the period from twenty-four (24) hours
ahead down to real time, to cover against uncertainties in availability of
The Arabic text is the legally binding version. The English translation is provided for guidance only.