Saudi Arabian Grid Code May 2024
Para. 5.3.7Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Issuance of Generation Schedule
5.3.7.1 The TSP shall issue the Generation Schedule by 15:00 hours each day for
the next following Schedule Day, providing that it gets all the necessary
information by 10:00 hours. However, if during the period in which the
Generation Schedule is being prepared, Incidents on the System (for
example, loss of Generation in a critical part of the System) occur which
require a substantial amendment to the data being used in preparing the
Generation Schedule, the TSP may extend the timescale for issuing of the
Generation Schedule to the extent necessary as a result of such Incidents.
The TSP shall also issue each update of the Generation Schedule as a result
of a new declaration made by the Saudi Sustainable Energy Control Center
on behalf of any Renewable Resource Generation.
5.3.7.2 The TSP may inform Generating Units before the issue of the Generation
Schedule for the Schedule Day to which the Instruction relates, if the length of
Notice to Synchronize requires the Instruction to be given at that time. When
the length of the time required for Notice to Synchronize is within thirty (30)
minutes of causing the Generating Unit to be unable to meet the indicative
Synchronizing time in the Generation Schedule or a subsequent Dispatch
Instruction, the Generator must inform the TSP without delay.
5.3.8 Negative Minimum Demand Regulation (NMDR)
5.3.8.1 Synchronized Generating Units shall at all times be capable of reducing
output sufficient to offset the loss of the largest secured Demand on the
System and shall be capable of sustaining this response. Sustainable
Resource Generation shall only be chosen for reducing output if no other unit
is available. The TSP will monitor the output data of the Generation Schedule
against Forecast Demand to see whether the level of NMDR is sufficient.
Where the level of NMDR for any period is insufficient, the TSP may contact
all Generators in relation to their relevant Generating Unit/Station in the case
of low NMDR and will discuss whether:
(i)
any change is possible to Generating Unit inflexibility; and/or
Chapter 5 - Scheduling and Dispatch Code
The Saudi Arabian Grid Code
Updated Version: May 2024
(ii)
any change is possible in declared Availability of a Generating Unit
which has been notified to the TSP.
5.3.8.2 In the event that the TSP is unable to differentiate between Generating Unit
Costs, the TSP shall instruct a Generator to Shutdown a specified Generating
Unit based upon the following factors:
(i)
effect on Power flows (resulting in the minimization of Transmission
System losses);
(ii)
reserve capability;
(iii)
Reactive Power worth; and
(iv)
in the case of localized NMDR, the effectiveness of output reduction in
the management of the System constraints.
(v)
a Sustainable Resource Generation shall only be chosen for
Shutdown if no other unit is available.
5.3.9 Inadequate Operating Margin
5.3.9.1 In the period following 10:00 hours each day and in relation to the following
Schedule Day, the TSP will monitor the output data of the Generation
Schedule against Forecast Demand and the Operating Margin to see whether
the anticipated level of the Operating Margin for any period is insufficient.
5.3.9.2 Where this level for any period is anticipated to be insufficient, the TSP will
send a Notification of Inadequate Operating Margin (NIOM) to each
Generator and Distribution Entity. The NIOM will indicate the insufficiency and
the period for which the insufficiency is anticipated.
5.3.9.3 The monitoring will be regular and revised NIOMs may be sent out from time
to time. These will reflect any changes in declared Availability which have
been notified to the TSP, and will reflect any Demand Control which has also
been so notified. They will also reflect generally any changes in the Forecast
Demand and the relevant Operating Margin.
Generation Dispatch
The Arabic text is the legally binding version. The English translation is provided for guidance only.
Freshness not yet recorded