Regulatory Framework for Renewable Energy Generation
Para. 2.1Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Selection of REG System Consultant/Contractor
Any Eligible Consumer wishing to install a REG System may select a
Consultant/Contractor. The Consultant/Contractor shall be accountable, on behalf
of an Eligible Consumer, for all the interactions with the Service Provider during
the REG System integration and Connection Process, as well as for the REG
System Design and the Electrical Installation works.
2.2 Feasibility Study
The Eligible Consumer is responsible for all preliminary studies related to the cost
assessment of the REG Systems, the estimation of revenues and savings based
on the power produced by the REG System, the consumption rates of the
Consumer and the expected return on investment.
Public
Regulatory Framework for Renewable Energy Generation for Self-Consumption
3. REG System Application
3.1 Application Process
The REG System Connection Process shall be commenced by:
a- Submission of a REG Connection Application Form to the Service Provider.
b- Proof of payment of the Application fee defined in Annex 2 of this regulatory
framework.
A separate REG Connection Application shall be submitted for each REG system.
REG Connection Applications for capacity expansion of an existing REG System
shall be treated the same way as a new REG System is treated. The REG System
generation and consumption shall be on the same Premises.
3.2 REG Application Screening
Upon receipt of the REG Connection Application, the Service Provider shall:
a- Verify the completeness of the REG Connection Application, and notify the
applicant of any missing document or information which shall be provided
within the time defined by the Service Provider in its REG System Connection
Process.
b- Notify the applicant when the REG Connection Application is complete.
A REG Connection Application shall be considered complete when all the items
indicated by the Service Provider in its REG System Connection Process have
been received and validated by the Service Provider.
The Arabic text is the legally binding version. The English translation is provided for guidance only.