Para. 2.1
Status unknownSaudi ArabiaRegulation

Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)

Selection of REG System Consultant/Contractor Any Eligible Consumer wishing to install a REG System may select a Consultant/Contractor. The Consultant/Contractor shall be accountable, on behalf of an Eligible Consumer, for all the interactions with the Service Provider during the REG System integration and Connection Process, as well as for the REG System Design and the Electrical Installation works. 2.2 Feasibility Study The Eligible Consumer is responsible for all preliminary studies related to the cost assessment of the REG Systems, the estimation of revenues and savings based on the power produced by the REG System, the consumption rates of the Consumer and the expected return on investment. Public Regulatory Framework for Renewable Energy Generation for Self-Consumption 3. REG System Application 3.1 Application Process The REG System Connection Process shall be commenced by: a- Submission of a REG Connection Application Form to the Service Provider. b- Proof of payment of the Application fee defined in Annex 2 of this regulatory framework. A separate REG Connection Application shall be submitted for each REG system. REG Connection Applications for capacity expansion of an existing REG System shall be treated the same way as a new REG System is treated. The REG System generation and consumption shall be on the same Premises. 3.2 REG Application Screening Upon receipt of the REG Connection Application, the Service Provider shall: a- Verify the completeness of the REG Connection Application, and notify the applicant of any missing document or information which shall be provided within the time defined by the Service Provider in its REG System Connection Process. b- Notify the applicant when the REG Connection Application is complete. A REG Connection Application shall be considered complete when all the items indicated by the Service Provider in its REG System Connection Process have been received and validated by the Service Provider.

The Arabic text is the legally binding version. The English translation is provided for guidance only.

Freshness not yet recorded

Related articles

Citing judgments

No judgments citing this article have been indexed yet.

Amendment timeline

No amendment history recorded.