Regulatory Framework for Renewable Energy Generation
Para. 3.3Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
REG Application Full Review
The Service Provider shall review a complete REG Connection Application. The
REG Application Review consists of:
a- Verifying the compliance of the REG Connection Application with the
provisions of this Regulatory Framework.
b- Assessing the impact of the proposed REG System on the network. It is the
responsibility of the Service Provider to define both the analysis and the
acceptance criteria of the grid impact assessment as well as to perform the
analysis with the data and information of the REG system included in the REG
Connection Application.
For REG Systems to be connected to medium voltage or low voltage
distribution networks, the Service Provider shall, in consultation with the
relevant Transmission Service Provider (if applicable), define procedures and
Public
Regulatory Framework for Renewable Energy Generation for Self-Consumption
criteria identifying single or clusters of queued REG Systems which are not
electrically independent from the transmission system and whose impact on
the grid is potentially not limited to the distribution network which the REG
systems have to be connected to but shall rather be extended to the
transmission system. For these REG Systems, the Service Provider shall
involve the Transmission Service Provider in the grid impact assessment.
c- If the REG Connection Application has an acceptable impact on the grid:
• The Service Provider shall approve and send back to the applicant initial
REG System Connection Application approval. The initial approval is for
the purpose of applying for SERA’s license, and it shall include the REG
System Connection fee. The REG System Connection Application fee
shall be according to Annex 2 of this Regulatory Framework.
• The validity of an approved REG Connection Application shall be defined
by the Service Provider in its REG System Connection Process.
• The Service Provider shall assign to the approved REG System part of the
REG hosting capacity and the applicant shall proceed with the next steps
of the REG System Connection Process. If, at the end of the validity period
of an approved REG Connection Application and upon verification by the
Service Provider, the REG System has yet to be connected for reasons
which are only attributable to the Eligible Consumer, the Service Provider
is entitled to release the capacity of the REG hosting capacity attributed to
the REG System in order to attribute such capacity to other approved REG
Connection Applications.
d- In the event that REG Application Review is not accepted:
• The Service Provider shall notify the applicant with a report identifying the
reasons of such outcome. If possible, the report shall also identify possible
amendments to the REG Connection Application which may allow for a
positive outcome of the REG Application Review.
• The applicant is granted a grace period to accept the amendments
proposed by the Service Provider or to propose other changes.
• The duration of the grace period shall be defined by the Service Provider
in its REG System Connection Process.
• The Service Provider shall review the resubmitted REG Connection
Application without any additional costs and keeping it in the same queue
within the given grace period.
Public
Regulatory Framework for Renewable Energy Generation for Self-Consumption
4. Obtaining SERA’s Generation License
Before proceeding with the installation works of the REG System, the Eligible
Consumer shall obtain SERA’s generation license in accordance to Clause (4.5)
of the Regulatory Framework, and go through all the other licensing procedures
necessary for the construction, installation and operation of the REG System. The
licensing procedures may involve more than one stakeholder and the Eligible
Consumer shall obtain all necessary permits and licenses from the concerned
stakeholders for building, installation and operation of the REG System.
5. REG System Connection