Saudi Arabian Grid Code May 2024
Para. 2.3.4Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Processing of the Application
2.3.4.1 The TSP shall process the User application for new, or modification of an
existing, Connection within thirty (30) days from the submission of the
completed application form and settlement of the admissible fees.
2.3.4.2 After evaluating the application submitted by the User, the TSP shall inform
the User whether its application is acceptable or not. The TSP will be entitled
to reject a User application if:
(i)
accepting of a User Development can lead the TSP to a breach of its
duties under the Electricity Law, Implementing Regulations, License
conditions, the Grid Code, or any other rule, regulation, or standard
relating to safe and secure operation of the Grid; or
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
(ii)
the applicant does not undertake to be bound, insofar as applicable,
by the terms and conditions of the Grid Code.
If the User application is acceptable, then the provisions of (2.3.4.3) through
(2.3.4.6) shall apply. If it is not, then the provisions of (2.3.4.7) through
(2.3.4.9) shall apply.
2.3.4.3 If the User application is acceptable, the TSP shall make an Offer of
Connection to the User. The Offer shall include the following:
(i)
details of how the Connection is to be made, including details of the
Plant and/or Apparatus that will be required to implement the
Connection;
(ii)
a description of any modification in the Transmission System that the
User is required to pay for;
(iii)
an indication of the Connection Date and the Operational Date; and
(iv)
an estimate of all the charges/costs for the Connection that the User
has to pay for.
2.3.4.4 The User shall accept the TSP’s Offer within thirty (30) days, or a longer
period as specified in the Offer, after which the Offer will automatically lapse.
2.3.4.5 The acceptance by the User of the TSP’s Offer of Connection shall lead to the
signing of a Connection Agreement or an amended Connection Agreement
(as the case may be).
2.3.4.6 If a Connection Agreement or an amended Connection Agreement (as the
case may be) is signed, the User shall submit to the TSP, within thirty (30)
days from the signing of the agreement or a longer period if agreed to by the
TSP and the User, the Standard Planning Data and Detailed Planning Data (if
required by the TSP) pertaining to the proposed User Development, as
specified in (Appendix A3.1) and (Appendix A3.2) of Chapter 3: Planning
Code.
2.3.4.7 If the application of the User is not acceptable, the TSP shall notify the User
why its application is not acceptable. The TSP shall include in its notification,
where practicable, a proposal on how the User’s application will be
acceptable to the TSP.
2.3.4.8 The User shall accept TSP proposal within thirty (30) days, or a longer period
as specified in the proposal, after which the proposal will automatically lapse.
2.3.4.9 If the TSP and the User cannot reach an agreement on the proposed
Connection or modification to an existing Connection, the User’s application
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
will be rejected. The User may refer the matter to the GCSC if the User so
desires.
The Arabic text is the legally binding version. The English translation is provided for guidance only.