Saudi Arabian Grid Code May 2024
Para. 2.4.4Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Harmonic Distortion
2.4.4.1 All Plant and Apparatus connected to the Transmission System shall be
capable of withstanding the levels of Harmonic distortion expected to be
present on the Transmission System.
2.4.4.2 Plant and Apparatus connected to the Transmission System shall not impose
voltage Harmonics on the Transmission System which exceed the limits
specified in the relevant Connection Agreement, or when no such limits are
specified there, a Total Harmonic Distortion of 1.5% with no individual
Harmonic greater than 1%.
2.4.4.3 Plant and Apparatus connected to the Transmission System shall not impose
current Harmonics on the Transmission System which exceed the limits
specified in the relevant Connection Agreement, or when no such limits are
specified there, the limits specified in IEEE Standard 519-1992:
Recommended Practices and Requirements for Harmonic Control in
Electrical Power Systems.
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
2.4.5 Voltage Unbalance
The User facility shall not cause the phase-to-phase unbalance of the
System, as measured with no load and with balanced three-phase loading, to
exceed by more than one (1) % at the Connection Point.
2.4.6 Voltage Fluctuation and Flicker Severity
2.4.6.1 The voltage fluctuation at any Connection Point with a fluctuating Demand
shall not exceed one (1)% of the nominal voltage level for step changes which
may occur repetitively. Any large voltage excursions other than step changes
may be allowed up to a level of three (3)% providing that this does not pose a
risk to the Transmission System or to the System of any other User.
2.4.6.2 The Flicker Severity at any Connection Point in the Transmission shall not
exceed the limits of Pst =0.8 and Plt=0.6, both 95th percentile values measured
over a period of one week.
2.4.7 Transient Voltage Variations
2.4.7.1 The User Systems shall be designed and operated to include the devices that
will mitigate the effects of transient over voltages and transient voltage dips
on the Grid and the User System.
2.4.7.2 The User shall take into account the effect of electrical transients when
specifying the insulation of their electrical Equipment.
2.4.8 Grounding
2.4.8.1 At voltages 110 kV and above, the Grid is effectively grounded with specified
Ground Fault Factor below 1.4.
2.4.8.2 The TSP shall specify in the Connection Agreement the Grounding
requirements and the applicable Ground Fault Factor at the Connection
Points, if an exception is to be permitted in certain cases.
2.4.9 Phase Jumps
The Inverter-Based Resource facilities must be designed to withstand
transitory phase jumps at the Connection Point without disconnecting from
the Grid and shutting down. The applicable control features must be available
in the inverter to accommodate instantaneous phase jumps occurring at the
Connection Point due to System disturbances and line-switching events.
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
2.4.10 Short Circuit Ratio
The lowest Short Circuit Ratio (SCR) at the point of Connection for which the
Inverter-Based Resource facilities is to be Connected to (including its control
systems) must be determined to ensure and maintain stability during
operation based on the agreed minimum and maximum short circuit level
during the Connection process. Thus, an SCR of not less than 3.0 should be
maintained at the point of Connection. If the SCR falls below 3.0, detailed
electromagnetic transient studies should be conducted to evaluate the
Inverter-Based Resource facilities Connection and verify its compliance and
its stable operation.
Plant and Apparatus at Connection Points
The Arabic text is the legally binding version. The English translation is provided for guidance only.