Saudi Arabian Grid Code May 2024
Para. 2.5.1Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
General Provisions
2.5.1.1 Each Connection between a User and the Transmission System shall be
controlled by a suitable isolating device (isolating switch or circuit breaker, as
determined by the TSP) capable of interrupting at the Connection Point, the
short circuit currents specified in the relevant Connection Agreement.
2.5.1.2 The User shall be responsible to ensure that all the User Plant and
Apparatus, including Protection Schemes, are tested and maintained and
remain rated for the duty required of them.
2.5.1.3 Users shall own, operate, and maintain all the facilities beyond the
Connection Point.
2.5.1.4 The TSP shall own, operate, and maintain all the facilities up to and including
those at the Connection Point.
2.5.1.5 The User shall comply with the operating instructions of the TSP with regard
to various systems (including all Plant and/or Apparatus) required to control
electric Power and Energy to (or from) that User’s facility.
2.5.1.6 For NPP, the TSP shall design the Grid to provide at least two (2)
independent Connection Points for the auxiliary load of each Generating Unit.
The Generator shall ensure automatic transfers between both Connection
Points in order to feed the auxiliary load of the Generating Unit.
Communication infrastructures between Generators and TSP shall be
designed to immediately inform the Generating Stations of any unavailability
of any of the Connection Points as described in the Connection Agreement.
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
The topology of the TSP substation(s) that includes the Connection Points of
the auxiliary load shall be agreed between the TSP and the Generator.
The Arabic text is the legally binding version. The English translation is provided for guidance only.