Saudi Arabian Grid Code May 2024
Para. 2.5.2Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Protection Equipment/Schemes
2.5.2.1 All Users shall be responsible for providing Protection for the Equipment and
facilities at their respective sides when connected to the Transmission
System.
2.5.2.2 All User Protection Schemes, relays and their settings, shall require prior
coordination with and approval of the TSP’s relevant Protection engineering
office.
2.5.2.3 The Protection Schemes shall isolate the faulty section and Equipment in
case of Fault with the dependability, selectivity, speed, and sensitivity as
defined in the applicable Connection Agreement or the Grid Code.
2.5.2.4 The protective Equipment connected to the Transmission System shall be
tested to achieve the specified level of dependability, selectivity, speed, and
sensitivity in Fault clearing and to minimize the impacts on the Grid.
2.5.2.5 The Protection Scheme’s ability to initiate the successful tripping of the circuit
breaker which is associated with the faulty Equipment shall be measured by
System Protection Dependability Index exceeding 99%.
2.5.2.6 Users shall comply with the following requirements for Fault clearance times
(from Fault inception to circuit breaker arc extinction) by primary Protection
not exceeding:
Network Category
Fault Clearance Times
110 kV
120 millisecond
115 kV
120 millisecond
132 kV
120 millisecond
230 kV
100 millisecond
380 kV
80 millisecond
The probability that these times will be exceeded for any given Fault must be
less than one (1)%.
2.5.2.7 To safeguard against failure of the primary Protection Systems provided to
meet the above Fault clearance time requirements, the Users shall also
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
provide backup Protection, which shall have Fault clearance time slower than
that specified for the User primary Protection. The TSP shall also provide
backup Protection, which shall have Fault clearance times slower than those
of the User backup Protection.
2.5.2.8 In case of the failure to trip a User’s circuit breaker provided to interrupt Fault
current interchange with the Transmission System, circuit breaker fail
Protection shall be provided to trip all necessary electrically adjacent circuit
breakers within 300 milliseconds. The design reliability for Protection shall be
equal to or greater than 99%.
2.5.2.9 Fault Disconnection Facilities
Where no circuit breaker is provided at the User Connection Point, the User
must provide to the TSP all necessary facilities and schemes to isolate with
discrimination and as necessary the Faults or Grid abnormalities, due to the
User Connection, on the Transmission System. In these circumstances, for
Faults on the User System, the User Protection should also trip higher voltage
TSP circuit breakers. These tripping facilities shall be in accordance with the
requirements specified in the relevant Connection Agreement.
2.5.2.10 Loss of Excitation Protection for Synchronous Generating Units
The Generator shall provide Protection to detect loss of Generating Unit
Excitation and initiate a trip of the associated Generating Unit.
2.5.2.11 Pole Slip Protection for Synchronous Generating Units
Where, in the TSP’s reasonable opinion, System requirements dictate, the
TSP shall specify in the Connection Agreement and/or Use of System
Agreement a requirement for Generators to fit pole slip Protection on their
Generating Units.
2.5.2.12 Access to Protection Equipment at Connection Points
No Busbar Protection, mesh corner Protection, circuit breaker fail Protection
relays, AC or DC wiring (other than Power supplies or DC tripping
associated with the User’s Plant and Apparatus) shall be worked upon or
altered by, or on behalf of, a User in the absence of a representative of, or
written authority from, the TSP.
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
2.5.2.13 Automatic Switching Equipment
Where automatic re-closing of TSP circuit breakers is required following
Faults on the User System, automatic switching Equipment shall be
provided in accordance with the requirements of the relevant Connection
Agreement.
2.5.2.14 Relay Settings
(i)
Protection and relay settings shall be coordinated by the TSP and
User(s) across the Connection Point in accordance with the
Connection Agreement to ensure effective Disconnection of faulty
Apparatus. In case of a dispute between any party on such issues, the
TSP shall be the final deciding authority.
(ii)
The TSP may install special Protection Schemes to safeguard against
collapse of the System for any foreseeable situation, e.g. during high
summer load seasons. In the event of loss of major Transmission
line(s) leading to voltage collapse in the Transmission System, the
TSP may need to resort to a large scale load shedding to halt
damaging voltage collapse which may lead to brownouts and eventual
blackouts. The auxiliary load of a NPP shall be considered as high
priority critical load.
The Arabic text is the legally binding version. The English translation is provided for guidance only.