Operation and Maintenance Safety Conditions
2.5.3.1 All Users responsible for the operation and maintenance shall also be
responsible for the Safety of Equipment, persons, and facilities at their
respective sides connected to the Transmission System. On Safety issues,
Users shall follow the procedures as laid down in section 4.10 of Chapter 4:
Operating Code and the Safety Rules referred to in that section.
2.5.3.2 Site Responsibility Schedule as provided in (2.7.5) will specify the ownership
responsibilities of each User connecting to the Transmission System for the
following:
(i)
ownership of the Plant/Equipment;
(ii)
the responsibility for operation and maintenance;
(iii)
Safety Rules and Procedures; and
(iv)
control of Plant/Equipments and facilities at their respective side.
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
2.5.4 Metering
Metering Equipment shall be installed at Connection Points in accordance
with the provisions of the Connection Agreement and the standards defined in
Chapter 7: Metering Code.
2.5.5 Requirements for Generators
2.5.5.1 All Synchronous Generating Units shall be capable of supplying rated Active
Power output at any point between the limits 85% Power Factor lagging and
95% Power Factor leading at the Generating Unit terminals, unless otherwise
agreed expressly by the TSP in the Connection Agreement.
All Power Park Modules shall be capable of absorbing or supplying reactive
power output at the connection point within the range Q = [-0.33, 0.33] of
rated active power for Active Power output above 20% of rated power, unless
a lower value of Active Power threshold is agreed upon expressly by the TSP
in the Connection Agreement.
Power Park Modules shall be capable of limiting reactive power output at the
connection point within the range Q=[-0.05, 0.05] of rated power for Active
Power output below 20% of rated power, unless a lower value of Active
Power threshold is agreed upon expressly by the TSP in the Connection
Agreement.
Figure 2.1 P-Q Diagram
2.5.5.2 All Generating Units must be capable of continuously supplying their rated
Active Power output at the Connection Point within the System frequency
P in p.u.
Q/Pmax
Underexcited
Operation
(leading)
Overexcited
Operation
(lagging)
Cos(phi) = 0.85
Cos(phi) = 0.95
SGU
PPM
Chapter 2 - Connection Code
The Saudi Arabian Grid Code
Updated Version: May 2024
range 59.5 to 60.5 Hz. Any decrease of Active Power output occurring in the
frequency range 57.0 to 59.5 Hz should not be more than a proportionate
decrease in the frequency as long as it is not higher than 4%/Hz.