Saudi Arabian Grid Code May 2024
Para. 4.10.9Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Coordination on Safety Matters
CHAPTER 5
Scheduling Process
Generator Declarations
Scheduling and Dispatch Parameters
Generator Nominations
Communication of Declarations and Nominations
Table of Contents
The Saudi Arabian Grid Code
Updated Version: May 2024
vi
The Generation Schedule
Issuance of Generation Schedule
Negative Minimum Demand Regulation (NMDR)
Inadequate Operating Margin
General Provisions
Dispatch Instructions to Generators
Generation Synchronizing and Desynchronizing Times
Dispatch of Active Power
Dispatch of Reactive Power
Additional Dispatch Instructions
System Emergency Conditions
Generating Unit/Station Parameter Changes
Automatic Reactive Power or Automatic Voltage Control System Mode of
Operation
5.4.10 Dispatch Instructions for Distribution Entities and Directly-connected
Customers
5.4.11 Nature of Dispatch Instructions
A5.1.1 Availability Notice
A5.1.2 Scheduling and Dispatch Parameters
Schedule 1: Generating Unit Technical Data
Schedule 2: Generating Unit/Station Outage Data
Schedule 3: Generation Operation Schedule Data
Schedule 4: Generation Operational Planning Data
Schedule 5: User System Data
Schedule 6: Connection Point Data
Schedule 7: Demand Control Data
Schedule 8: Scheduling and Dispatch Data
Schedule 9: User System Load Characteristics
Schedule 10: Fault Infeed Data
Schedule 11: User Demand Profiles and Active Energy Data
Schedule 12: Data Supplied by the TSP to Users
Table of Contents
The Saudi Arabian Grid Code
Updated Version: May 2024
vii
CHAPTER 7
Damage, Tampering, or Unauthorized Interference with Metering Equipment
Table of Contents
The Saudi Arabian Grid Code
Updated Version: May 2024
viii
Table of Figures:
No.
Figure No.
Title
Page
No.
Figure 1.1
Grid Code Amendment/Derogation Process
Figure 2.1
P-Q Diagram
Figure 2.2
Maximum Output Power Reduction Diagram
Figure 2.3
Normal operating range: transmission-connected
facilities, 110-380 kV
Figure 2.4
BESS response during normal, high, and low frequency
Figure 2.5
Voltage Withstand Capability Diagram
Figure 2.6
Procedure for Connection to the Grid
Figure 4.1
Description and time flow of various operational
planning phases
Figure 4.2
Program horizon for Generating Unit Outages
Figure 4.3
Program Horizon for Transmission System Outages
Figure 5.1
Overview of Generation Scheduling Process
Figure 5.2
Overview of the Dispatch Process
List of Tables:
No.
Reference No.
Title
Page No.
Subsection 2.4.2
Frequency Variations
Subsection 2.4.3
Voltage Variations
Clause 2.5.2.6
Fault Clearance Times
Table A2.1
Pro Forma for Site Responsibility Schedule
Subsection
The Arabic text is the legally binding version. The English translation is provided for guidance only.