Saudi Arabian Grid Code May 2024
Para. 4.6.3Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Contact Locations and their Adequacy
4.6.3.1 The contact location between the TSP and the User for communicating on
matters pertaining to Transmission System operation shall be the TSP
Control Center for the TSP, and the User Control Center for the User.
4.6.3.2 The User is required to establish and maintain a Control Center that shall be
staffed at appropriate levels at all times.
4.6.3.3 The User shall designate a Responsible Engineer at its Control Center who
shall respond to communications from the TSP without undue delay. The
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
User’s Responsible Engineer should have adequate experience and training,
and must be authorized to perform the following operations on behalf of the
User:
(i)
to receive and acknowledge receipt of a given instruction from the
TSP; and
(ii)
to accept and execute instructions from the TSP.
4.6.3.4 The User’s contact locations and personnel (including their electronic mailing
addresses, if any) shall be notified by the Users to the TSP prior to
Connection and updated thereafter as appropriate.
4.6.3.5 If the TSP Control Center or the User Control Center is moved to another
location, the TSP shall notify the Users or the relevant User shall notify the
TSP (as the case may be) without delay of the new location and any changes
to the communication facilities necessitated by such a move.
4.6.3.6 The communications (other than relating to the submission of data and
notices) between the TSP and the User shall take place between the TSP
Control Engineer and the relevant User’s Responsible Engineer as provided
in section (1.12) in Chapter 1: General Conditions.
4.6.3.7 Each User shall have one telephone and one facsimile unit on separate lines
reserved for operational purposes only, which must be continuously attended
to and answered without undue delay.
4.6.3.8 The TSP and Users shall keep all Operational Data communicated between
them as confidential.
4.6.4 Communication Systems and Equipment
4.6.4.1 For communication between the TSP and Users, SCADA and other
communication facilities for voice as well as data transmission shall be
provided. These facilities shall be designed, maintained, upgraded, and kept
compatible with the SCADA and Communication facilities of the TSP, in
accordance with the terms and conditions and standards as laid down in the
relevant Connection Agreement.
4.6.4.2 The TSP shall provide (at the cost of the relevant User) the SCADA system
for monitoring real time information and controlling the Equipment at facilities
of respective sides.
4.6.4.3 All Users shall provide a TSP approved voice communication service to
provide both primary and alternate communication link between the TSP and
the operator controlling the User facility.
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
4.6.4.4 All Users shall provide monitoring and recording instruments at their
respective sides connected to the Transmission System.
4.6.4.5 All communication facilities shall be constructed, operated, and maintained
according to the TSP standards for such facilities, or in their absence, to
relevant standards of the International Telecommunication Union (ITU), IEC,
or their Saudi national equivalents.
The Arabic text is the legally binding version. The English translation is provided for guidance only.
Freshness not yet recorded