Conditions of Monitoring and Recording Equipment
4.6.5.1 The TSP shall provide SCADA outstation interface Equipment. The User shall
provide such voltage, current, frequency, Active Power and Reactive Power
measurement outputs and Plant status indications and alarms to the TSP
SCADA outstation interface Equipment as required by the TSP in accordance
with the terms and conditions of the relevant Connection Agreement.
4.6.5.2 Active Power and Reactive Power measurements, circuit breaker and
Disconnector status indications from Generating Units must each be provided
to the TSP on an individual Generating Unit basis.
4.6.5.3 The manner in which information is required to be presented to the outstation
Equipment shall be set out in the relevant Connection Agreement.
4.6.5.4 The TSP shall provide Data Acquisition Systems, Disturbance Recorders,
and/or Event Loggers (as the case may be) for recording the performance of
the Transmission System.
4.6.5.5 Monitoring Equipment shall be provided on the Transmission System by the
TSP to monitor the System dynamic performance.
4.6.6 SCADA Systems
4.6.6.1 The SCADA system should be capable of exchanging the System status and
data from the TSP to the User, and vice versa.
4.6.6.2 Participants shall interface via the standard digital interfaces. Interface
cabinets shall be installed in the Participant’s Plant and Equipment room. The
provision and maintenance of the wiring and signaling from the Participant’s
Plant and Equipment to the interface cabinets shall be the responsibility of the
Participant.
4.6.6.3 The information exchange shall support data acquisition from remote terminal
units (RTUs). The TSP should be able to monitor the system status and data
via telemetry from the RTUs connected to the Users’ Plant.
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
4.6.6.4 The TSP shall have the capability to deactivate and reactivate the scanning of
a given RTU, as well as the capability of monitoring the availability of all RTUs
from a central location.
4.6.6.5 All communication facilities (including SCADA) shall be secured against
unauthorized access. The TSP shall agree with the User, the procedures
governing security and access to the User’s SCADA, computer, and
communication facilities. The procedures shall allow access to the Equipment
and information by the TSP or its nominated representative(s) for the
purposes of maintenance, repair, testing, and reading of meters.
Contingency Planning
4.7.1 Introduction
4.7.1.1 In Emergency situations, the Security of the Transmission System can come
under abnormal stresses and the electricity supply systems can suffer Partial
or Total Shutdown. To deal with such eventualities, and to ensure that the
System gets back to its normal state as quickly and safely as practicable, the
instructions and procedure established in this section shall be followed by the
TSP and Users.
4.7.1.2 The TSP shall include Generators providing Black Start capability in
conducting System-wide training and drills, as considered necessary by the
TSP to re-Energize the Transmission System following a Partial or Total
System Shutdown.
4.7.1.3 Any emergency drills conducted by either the TSP or the User shall be
coordinated between the TSP and the relevant User, and also with any other
Affected User(s).
4.7.2 Objective
The objective primarily is to ensure that in the event of a Partial or Total
Shutdown of the Transmission System, normal supply is restored to all the
Users as quickly and safely as practicable in accordance with Good Industry
Practices.