Saudi Arabian Grid Code May 2024
Para. 4.5.6Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Significant Incident Reporting Procedure
4.5.6.1 A Significant Incident Notice shall be issued by the TSP or a User, as the
case may be, as soon as possible after the occurrence of the Significant
Incident, and shall identify the following, if possible:
(i)
date, time, and location of the Incident;
(ii)
brief description of the Incident;
(iii)
expected impact;
(iv)
expected time to restore; and
(v)
cause, if known.
4.5.6.2 The TSP shall investigate any Significant Incident that materially affected the
Quality of service to another User. These may include Interruptions of supply,
Disconnections, under or over voltage or frequency Incidents, or Quality of
supply contraventions, etc. A preliminary Significant Incident Report shall be
available after fifteen (15) working days and a final Significant Incident Report
within two (2) months. The TSP shall initiate and coordinate such an
investigation, arrange for the writing of the report, and involve all Affected
Users. The Users shall make all relevant information available to the TSP and
participate in the investigation where reasonably required. The TSP shall
make the report available (if requested) to any User within the confidentiality
constraints.
4.5.6.3 The Users shall prepare and submit to the TSP monthly Operations Reports
on Grid operation. These reports shall include an evaluation of the
Operations, Events, Significant Incidents, and any other problems that
occurred on the Grid during the previous month, the measures undertaken by
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
the Users to address them, and the recommendations to prevent their
recurrence in the future. The Users shall prepare and submit to the TSP
quarterly and annual Operations Reports also. These reports shall include the
Operations, Events, and Significant Incidents that had a Material Effect on the
Transmission System or the System of any User (as the case may be) during
the past quarter or the year.
Operational Communication between the TSP and Users
4.6.1 Introduction
To ensure proper operation and control of the Transmission System, standard
and efficient communication links and facilities between the Users and the
TSP are imperative. This section specifies the details of the communication
facilities required between the TSP and Users and also establishes the
procedure to be used by the TSP and Users to ensure timely exchange of
information to enable the TSP to discharge its obligations regarding the
operation of the Transmission System.
4.6.2 Objectives
The objectives of this section are the following:
(i)
to establish contact locations for the TSP and the User;
(ii)
to detail the communication facilities required between the TSP and
the User;
(iii)
to establish the procedures for exchange of information between the
TSP and the User; and
(iv)
to establish the general procedures for the authorization of the TSP
and User personnel to act on behalf of their respective entities in the
communication of information between the TSP and the User.
The Arabic text is the legally binding version. The English translation is provided for guidance only.
Freshness not yet recorded