Saudi Arabian Grid Code May 2024
Para. 4.7.5Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
System Restoration
4.7.5.1 To ensure that in the event of a Partial or Total Shutdown of the Transmission
System, normal supply is restored to all Users as quickly and as safely as
practicable, it is necessary to provide in the Grid Code a mechanism on how
such Partial or Total Shutdown of the Transmission System is to be dealt
with, and to ensure that the necessary procedures and facilities are in place
to support rapid re-establishing of the Shutdown parts, and to restore Supply
to Users.
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
4.7.5.2 The Objectives of System Restoration are the following:
(i)
to provide a general System Restoration strategy which will be
adopted by the TSP in the event of a Partial or Total Shutdown of the
Transmission System;
(ii)
to establish the responsibility of the TSP to produce and maintain a
comprehensive System Restoration Plan, covering both Partial and
Total Shutdowns;
(iii)
to establish the responsibility of Users to co-operate with the TSP in
the development and execution of the System Restoration Plan; and
(iv)
to ensure that the TSP and User staff who will be potentially involved
with the System Restoration Plan, should be adequately trained and
fully familiar with the relevant details of the Plan.
4.7.5.3 During restoration process of the Transmission System, the normal standards
of voltage and frequency shall not apply.
4.7.5.4 The TSP shall conduct drills, at least once each year, to train the Users for
Emergency preparedness. The date and time of execution of such drills shall
be agreed by the TSP with Users in advance and the TSP shall issue a Red
Alert for such a drill. The Users must cooperate with the TSP for conducting
such drills/testing.
4.7.5.5 Restoration Plan
(i)
The TSP shall issue instructions for the Generators with Black Start
Capability to initiate the Start-up. The Generator providing Black Start
shall then inform the TSP that its Generating Unit is dispatchable
within thirty (30) minutes.
(ii)
Upon receipt of the instruction from the TSP, Generating Unit
providing Black Start shall Start-up immediately to Energize a part of
the System and/or Synchronize with the System.
(iii)
The overall strategy in restoring of the System after a Partial or Total
Shutdown shall, in general, include the following:
(a)
overlapping phases of restoration of islanded parts of the
System;
(b)
step-by-step integration of the islanded parts of the System
into larger sections; and
(c)
eventual restoration of the whole System.
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
(iv)
The TSP shall coordinate the providing of Backup Reserve by thermal
Generating Units so that these can be put back to the Grid without
going to the full restart procedure.
(v)
The TSP shall inform the Users, after completing the System
Restoration procedure and the restoration of the System, that the
Blackout no longer exists and that the System is back to the normal
state.
(vi)
The TSP will coordinate with Generators to provide power, first to
auxiliary load of NPPs, and then start up Power (not reserve) to steam
Units/Plants.
4.7.5.6 Resynchronization of Islanded Parts of The Grid
(i)
When parts of the System are not Synchronized with each other, the
TSP shall instruct Users to regulate Generation and/or Demand to re-
Synchronize the islanded parts of the System.
(ii)
If a part of the System is not connected to the rest of the System, but
there is no Blackout in that part, the TSP shall undertake the re-
Synchronization/reconnection of that part to the rest of the System.
Operational Testing