Saudi Arabian Grid Code May 2024
Para. 4.8.1Status unknownSaudi ArabiaRegulation
Issued by Saudi Electricity Regulatory Authority (sera.gov.sa)
Introduction
Operational Tests, which involve the simulation of conditions or the controlled
application of unusual or extreme conditions, can have undesirable effects on
the Transmission System. This section, therefore, deals with the
responsibilities and procedures for arranging and carrying out of Operational
Tests on the Transmission System in order to minimize any threats to the
integrity of Equipment, the Security of the Grid, as well as any other
detrimental effects on the TSP and other Users. Tests under this section shall
exclude routine testing, Commissioning or re-Commissioning Tests, or any
other tests of a minor nature.
4.8.2 Objective
The primary objectives are:
(i)
to establish a process for conducting Operational Tests on the System
by the TSP or other Users in such a way as to ensure that such tests,
Chapter 4 - Operating Code
The Saudi Arabian Grid Code
Updated Version: May 2024
as much as possible, do not threaten the Safety or Security of the
System, Equipment, or life; and
(ii)
establish a procedure for conducting such tests.
4.8.3 Operational Test Request
4.8.3.1 If a User wishes to undertake an Operational Test on the Transmission
System (or the User System), it shall initiate a Test Request that contains the
following:
(i)
the purpose and nature of the proposed test;
(ii)
the extent and condition of the Equipment involved; and
(iii)
a proposed Test Procedure specifying the switching sequence and the
timing of the switching sequence.
4.8.3.2 The Test Proponent shall provide sufficient time for the TSP to plan the
proposed test. The TSP shall determine the time required for each type of the
test and the associated costs that shall be borne by the User requesting the
test(s).
4.8.3.3 The TSP may require additional information before approving the proposed
test if the information contained in the Test Request is insufficient or the
proposed Test Procedure cannot ensure the Safety of personnel or the
Security of the Grid.
4.8.3.4 The TSP shall determine and notify other Users, other than the Test
Proponent, that may be affected by the proposed Operational Test.
4.8.3.5 The TSP may also initiate an Operational Test if it determines that this test is
necessary to ensure the Safety, Stability, Security, and Reliability of the
Transmission System.
The Arabic text is the legally binding version. The English translation is provided for guidance only.